| American Railway Association - 1907 - 1162 halaman
...manufacturer to satisfy him that the finished material is furnished in accordance with the terms of these specifications. All tests and inspection shall be...at the place of manufacture prior to shipment and FO conducted as not to unnecessarily interfere with the operation of the mill. On request of the inspector,... | |
| American Railway Engineering Association - 1920 - 1492 halaman
...shall afford the inspector, free of cost, all reasonable facilities to satisfy him that the tie plates are being furnished in accordance with the specifications. All tests and inspection shall be made at the place of manufacture prior to shipment, unless otherwise specified, and shall be so conducted... | |
| American Railway Engineering Association - 1920 - 1544 halaman
...shall afford the inspector, free of cost, all reasonable facilities to satisfy him that the tie plates are being furnished in accordance with the specifications. All tests and inspection shall be made at the place of manufacture prior to shipment, unless otherwise specified, and shall be so conducted... | |
| 1921 - 910 halaman
...shall afford the inspector, free of cost, all reasonable facilities to satisfy him that the tie plates are being furnished in accordance with the specifications. All tests and inspection shall be made at the place of manufacture prior to shipment, unless otherwise specified, and shall be so conducted... | |
| |