Gambar halaman
PDF
ePub

CHAPTER 23

AN ACT making appropriations for the maintenance and repair of improved

state and county highways, and roads on Indian reservations. Became a law February 18, 1925, with the approval of the Governor. Passed,

three-fifths being present.

The People of the State of New York, represented in Senate and Assembly, do enact as follows:

.

Section 1. The several amounts named in this act, or so much approprithereof as may be necessary, are hereby appropriated from any moneys in the treasury not otherwise appropriated, together with any accrued interest on unexpended balances while in the hands of county treasurers, to be expended in accordance with the provisions of chapter thirty of the laws of nineteen hundred and nine, as amended, being the highway law.

DEPARTMENT OF PUBLIC WORKS.

BUREAU OF HIGHWAYS.

DIVISION No. 1.

For the maintenance and repair of state and county highways, including personal service; division expenses other than personal service; highways to be resurfaced either by contract or directly by the department; highways to be surface treated either by contract or directly by the department; highways to be reconstructed either by contract or directly by the department; repair of wooden trestle bridge over South bay, Lake Champlain, on state route number forty-eight, Washington county; general maintenance of the Southern Boulevard viaduct on state route number three, Albany county; changing location of grade crossing on highway number eight thousand one hundred thirty-one, Saratoga county, and for general maintenance and repairs in the counties comprising division number one. The following amounts to be made immediately available for the purposes herein indicated: Albany county, two hundred twenty-seven thousand, two hundred forty-three dollars and fifty cents ($227,243.50); Essex county, three hundred fiftyfive thousand, three hundred sixty dollars and fifty cents ($355,360.50); Greene county, ninety-two thousand, five hundred eightyfive dollars and fifty cents ($92,585.50); Rensselaer county, one hundred sixty-six thousand, two hundred forty-three dollars and fifty cents ($166,243.50); Saratoga county, ninety-nine thousand, seven hundred sixty dollars and fifty cents ($99,760.50); Schenectady county, ninety thousand, five hundred ten dollars and fifty cents ($90,510.50); Warren county, one hundred eighty thousand, nine hundred thirty-five dollars and fifty cents ($180,935.50); Washington county, ninety-five thousand, three hundred ten dollars and fifty cents ($95,310.50).

SCHEDULE A.

Personal Service. Salaries

Engineering, supervision and inspection employes. $52,550 00

[ocr errors]

SCHEDULE B.

Division Expenses.

(Other than personal service.) Supplies Office

$350 00 Hired horses and vehicles and hired motor vehicles

8,000 00 Traveling expenses

6,000 00 Communication

1,000 00 Rents — office

900 00 Advertising and printing

400 00 Rental of engineering instruments..

300 00

16,950 00

(General charges - Department tools, plant and

equipment.)
Industrial equipment
Purchase of
Surplus war material turned over to.

New York state and to pay other
expenses incidental to the delivery
of
same,

including insurance
thereon

$1,000 00 Motor equipment and war tax.. 1,000 00 Boilers, engines,

engines, rollers, heating kettles, distributors, stone crushers, mechanical loaders, road machines, wagons and miscellaneous equipment

12,000 00 Tools and general plant..

4,000 00 Repairs for motor vehicles and maintenance equipment

28,000 00 Motor vehicle insurance Liability, property damage, collision, fire and theft

2,500 00 Storehouse Acquisition of site for and construction

of, including repairs and alterations. 500 00 Storage rental

1,000 00 Maintenance equipment, machinery and

general plant, insurance thereon.... 500 00

50,500 00

Total for Schedule B......

$67,450 00

SCHEDULE C.
For highways to be resurfaced either by contract or

directly by the department..

$0 00

SCHEDULE D.
For highways to be surface treated either by con-

tract or directly by the department.....

59,500 00

SCHEDULE E.
For highways to be reconstructed either by contract

or directly by the department....

454,075 00

SCHEDULE F.

General Maintenance and Repair.
Personal service
Wages, temporary
Foremen, laborers, mechanics,

chauffeurs, teams and trucks.... $417,875 00
Industrial equipment
Rental of
Rollers, crushers, distributors and
tools

2,500 00 Supplies for equipment

25,000 00
Materials
Including broken stone, sand, gravel,

iron ore tailings, bituminous mate-
rials, cement, sulphite liquor, paint,
lumber, calcium chloride and gen-
eral plant ...

224,650 00
General maintenance Southern Boule-
vard viaduct

1,000 00 Repairs and maintenance to South Bay bridge

3,000 00 Changing location of grade crossing

switch on highway 8131, Saratoga county, pursuant to an order of the public service commission

350 00

Total for Schedule F.

674,375 00

Total for Division No. 1......

$1,307,950 00

DEPARTMENT OF STATE HIGHWAYS

DIVISION No. 2. For the maintenance and repair of state and county highways, including personal service; division expenses other than personal scrvice; highways to be resurfaced either by contract or directly by the department; highways to be surface treated either by contract or directly by the department; highways to be reconstructed either by contract or directly by the department; and for general maintenance and repairs in the counties comprising division number two. The following amounts to be made immediately available for the purposes herein indicated: Fulton county, one hundred sixty-six thousand, six hundred thirty-six dollars ($166,636.00); Hamilton county, forty-nine thousand, nine hundred sixtyone dollars ($49,961.00); Herkimer county, two hundred thirteen thousand, seven hundred seventy-seven dollars ($213,777.00); Madison county, two hundred eighty-three thousand, four hundred twenty-eight dollars ($283,428.00); Montgomery county, seventynine thousand, five dollars ($79,005.00); Oneida county, five hundred twenty-one thousand, six hundred ninety-three dollars ($521,693.00).

SCHEDULE A.

Personal Service.
Salaries

Engineering, supervision and inspection employes $40,000 00

[ocr errors]
[ocr errors]

SCHEDULE B.

Division Expenses

(Other than personal service.)
Supplies
Office

$50 00
Hired horses and vehicles and hired motor
vehicles

6,000 00
Traveling expenses.

3,000 00 Communication

600 00 Rents - office

550 00 Advertising and printing..

140 00 Rental of engineering instruments..... 10 00

10,350 00

[ocr errors]

(General charges - Department tools, plant and

equipment.)
Industrial equipment
Purchase of
Surplus war material turned over to

New York state and to pay other
expenses incidental to the delivery
of same, including

insurance
thereon

500 00 Motor equipment and war tax..

500 00
Boilers, engines, rollers, heating ket-

tles, distributors, stone crushers,
mechanical loaders, road machines,
wagons and miscellaneous equip-
ment

12,650 00
Tools and general plant.

2,000 00

[blocks in formation]

$ 0.00

SCHEDULE C.
For highways to be resurfaced either by contract or
directly by the department...

SCHEDULE D.
For highways to be surface treated either by contract

or directly by the department...

90,000 00

SCHEDULE E.
For highways to be reconstructed either by contract

or directly by the department..

715,000 00

SCHEDULE F.

General Maintenance and Repair.
Personal service
Wages, temporary
Foremen, laborers, mechanics, chauf-

feurs, teams and trucks..........$240,000 00
Industrial equipment
Rental of
Rollers, crushers, distributors and
tools

3,500 00 Supplies for equipment.

25,000 00
Materials
Including broken stone, sand, gravel,

iron ore tailings, bituminous mater-
ials, cement, sulphite liquor, paint,
lumber, calcium chloride and general
plant ..

156.000 00

Total for Schedule F.....

424,500 00

Total for Division No. 2.......

$1,314,500 00

« SebelumnyaLanjutkan »