Culverts, bridges, road crossings and signs, cattle guards, etc...

$56,000

[blocks in formation]
[blocks in formation]

Right of way, as per accompanying schedule
Land for depots, stations, etc., as per schedule
Total cash valuation of all lands purchased.......
Grading, as per schedule

Masonry, as per schedule.

Bridging, as per schedule: [No. iron bridges, 1]
Total cash valuation of substructure..

[blocks in formation]

Ties: 118.5 miles ...

156,420

Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60]
Chairs, spikes, fish-bars, etc., schedule

893,490

9...

90,885

Laying track, $400; ballasting, $1,000...

165, 900

Total cash valuation of superstructure

1,306,695

Passenger stations and fixtures, as per schedule.
Freight stations and fixtures, as per schedule..
Engine and car shops, as per schedule.

102,400

Machine shops, as per schedule..

[blocks in formation]

Fencing

......

249, 100

35,000

3,600

Wood sheds and water stations, and miscellaneous,

Elevators, as per schedule..

Total cash valuation of buildings of every sort, fencing, etc...

61,000

80,000

93,000

624, 100

[blocks in formation]

South Milwaukee to Portage (via Horicon), 98 miles, and North Milwaukee to Schwarzburg, 6.3 miles.

SCHEDULE 1. Right of Way.

103 miles through unplatted lands

$257,500

SCHEDULE 2. Depot Grounds.

NORTH MILWAUKEE.

29 lots in blocks 30, 33, 40 and 41, at $6,000.....

$174,000

5 lots in block 30, $12,500, 5 lots in block 21, $9,500 8 lots in blocks 1 and 13, at $500

20,000

4,000

Part of blocks 33, 47 and 48, at $2,500, 1,750 x 100 ft.,

$8,000..

10,500

14 acres shop grounds..

28,000

Hartford

$25,000

Rubicon

5,000

[blocks in formation]

Bridging..

24,800

Stone and wood culverts, pile abutments, road bridges, cattle guards, highway crossings, road mile posts, etc ...

[blocks in formation]

SCHEDULE 9. Chairs, Spikes, Fish Bars and Switches.

118.5 miles chair spikes, etc., at $643 per mile

Extra cost of switches for 142 miles side track, at $950... 3 railroad crossings .

$76, 195 13, 490 1,200

$90,885

[blocks in formation]

$57,500 $24,000 $2,000 $7,700 $242,100 $18, 600 $92,000

Schwarzburg

500

Granville

[blocks in formation]

Richfield

[blocks in formation]

Schleissingerville

2,500

Hartford..

[blocks in formation]

Rubicon

1,200

Woodland

Iron Ridge

Horicon Junction..

[blocks in formation]

Minn. Junction

Rolling Prairie

8,500

....

1,500

1,000

Beaver Dam ...

Fox Lake Junction..

Randolph....

Cambria..

Pardeeville

[blocks in formation]
[blocks in formation]

$102,400 $35,000 $3,600 $40,100 $249, 100 $20,900 $93,000

[blocks in formation]

Turn tables, as per sched..

[No. 2.

3,200

Wood-sheds, water-stations and miscellaneous, as

per schedule...

12,700

Fencing...

[No. miles, 40.]

32,000

Elevators, as per schedule... [No. 1. ].

Total cash val. of buildings, fencing, etc. Engineering expenses before and during construc'n Salaries of officers and agents essential during con. Total cost of eng. and official man. during con.

Total cash value of line unequipped...

[blocks in formation]
[blocks in formation]