Right of way, as per accompanying schedule Masonry, as per schedule. Bridging, as per schedule: [No. iron bridges, 1] Ties: 118.5 miles ... 156,420 Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60] 893,490 9... 90,885 Laying track, $400; ballasting, $1,000... 165, 900 Total cash valuation of superstructure 1,306,695 Passenger stations and fixtures, as per schedule. 102,400 Machine shops, as per schedule.. Fencing ...... 249, 100 35,000 3,600 Wood sheds and water stations, and miscellaneous, Elevators, as per schedule.. Total cash valuation of buildings of every sort, fencing, etc... 61,000 80,000 93,000 624, 100 South Milwaukee to Portage (via Horicon), 98 miles, and North Milwaukee to Schwarzburg, 6.3 miles. SCHEDULE 1. Right of Way. 103 miles through unplatted lands $257,500 SCHEDULE 2. Depot Grounds. NORTH MILWAUKEE. 29 lots in blocks 30, 33, 40 and 41, at $6,000..... $174,000 5 lots in block 30, $12,500, 5 lots in block 21, $9,500 8 lots in blocks 1 and 13, at $500 20,000 4,000 Part of blocks 33, 47 and 48, at $2,500, 1,750 x 100 ft., $8,000.. 10,500 14 acres shop grounds.. 28,000 Hartford $25,000 Rubicon 5,000 Bridging.. 24,800 Stone and wood culverts, pile abutments, road bridges, cattle guards, highway crossings, road mile posts, etc ... SCHEDULE 9. Chairs, Spikes, Fish Bars and Switches. 118.5 miles chair spikes, etc., at $643 per mile Extra cost of switches for 142 miles side track, at $950... 3 railroad crossings . $76, 195 13, 490 1,200 $90,885 $57,500 $24,000 $2,000 $7,700 $242,100 $18, 600 $92,000 Schwarzburg 500 Granville Richfield Schleissingerville 2,500 Hartford.. Rubicon 1,200 Woodland Iron Ridge Horicon Junction.. Minn. Junction Rolling Prairie 8,500 .... 1,500 1,000 Beaver Dam ... Fox Lake Junction.. Randolph.... Cambria.. Pardeeville $102,400 $35,000 $3,600 $40,100 $249, 100 $20,900 $93,000 Turn tables, as per sched.. [No. 2. 3,200 Wood-sheds, water-stations and miscellaneous, as per schedule... 12,700 Fencing... [No. miles, 40.] 32,000 Elevators, as per schedule... [No. 1. ]. Total cash val. of buildings, fencing, etc. Engineering expenses before and during construc'n Salaries of officers and agents essential during con. Total cost of eng. and official man. during con. Total cash value of line unequipped... |