Report to the Federal Power Commission on the Uses of the Upper Columbia RiverU.S. Government Printing Office, 1925 - 126 halaman |
Edisi yang lain - Lihat semua
Istilah dan frasa umum
acre-feet acres Albany Falls April August Basin gravity project Basin pumping project British Columbia canal cent Clark Fork Columbia Basin gravity Columbia Basin irrigation Columbia Basin project Columbia Basin pumping Columbia River board County Dalles December drainage basin effective horsepower elevation estimated February Federal Power Commission feet Flathead Lake Flathead power Flathead River flood gravity plan Idaho inflow international boundary irrigable areas irrigation irrigation demands irrigation expansion January July June Kettle Falls Lake Pend Oreille land low water majority report March Metaline Falls miles Missoula Montana month Mouth of Flathead navigation Newport November October Okanogan Oreille and Priest Pasco Pend Oreille Lake PLATE Polson power development power interests power possibilities Priest Lake Priest Lake storage Priest Rapids Priest River reservoirs rock run-off second-feet September shortage Snake River Spokane River storage control storage in Pend studies supply Total tributaries upper Columbia River valley Washington Wenatchee
Bagian yang populer
Halaman iii - That the project adopted, including the maps, plans, and specifications, shall be such as in the judgment of the Commission will be best adapted to a comprehensive plan for improving or developing a waterway or waterways for the use or benefit of interstate or foreign commerce, for the improvement and utilization of waterpower development, and for other beneficial public uses...
Halaman 82 - That nothing in this Act shall be construed as affecting or intended to affect or to in any way interfere with the laws of any State or Territory relating to the control, appropriation, use or distribution of water used in irrigation...
Halaman iii - ... Act of 1920 relating to the licensing of non-Federal hydroelectric projects, and by adding Parts II and III vesting the Commission with jurisdiction over the transmission and sale at wholesale of electric energy in interstate commerce and public utilities engaged therein. The Commission is enpowered to make investigations and to collect and record data concerning the utilization of water resources in any region to be developed; to cooperate with other agencies of state and Federal governments...
Halaman iii - ... will be best adapted to a comprehensive scheme of improvement and utilization for the purposes of navigation, of water-power development, and of other beneficial public uses; " and it provides that "if necessary in order to secure such scheme, the commission shall have authority to require the modification of any project and of the plans and specifications of the project works before approval.
Halaman 3 - ... storage in Pend Oreille and Priest Lakes in Idaho, conditioned upon maintenance of natural flow from Flathead Lake when needed. "(e) The Columbia Basin project can be supplied with practically no shortage without the aid of storage, with a dam at Grand Coulee about 156 feet high above low water. " (f) Information upon which to base a final decision between a gravity and a pumped supply for a Columbia Basin irrigation project is not complete and should be completed. Any decision should take into...
Halaman 82 - Territory relating to the control, appropriation, use or distribution of water used in irrigation, or any vested right acquired thereunder, and the Secretary of the Interior, in carrying out the provisions of this Act, shall proceed in conformity with such laws...
Halaman iii - To cooperate with the executive departments and other agencies of State or National Governments in such investigations; and for such purpose the several departments and agencies of the National Government are authorized and directed upon the request of the commission, to furnish such records, papers, and information in their possession as may be requested by the commission, and temporarily to detail to the commission such...
Halaman ii - FEDERAL POWER COMMISSION. The SECRETARY OF WAR, Chairman, The SECRETARY OF THE INTERIOR, The SECRETARY OF AGRICULTURE. OC MEHBILL, Executive Secretary.
Halaman 50 - ... Lakes should be granted to such project, but should be limited to storage or inflow in excess of 7,000 second-feet. " (i) If ultimately the decision is in favor of a Columbia Basin pumping project, storage rights in Pend Oreille and Priest Lakes should be granted to the joint interests of power on the lower Clark Fork and the Columbia River, subject to limitations contained in section (a). "(j) Storage rights in Flathead Lake should be granted to Flathead power Interests, subject to fullest development...
Halaman 50 - The Columbia Basin project can be adequately supplied by the aid of storage in Pend Oreille and Priest Lakes in Idaho, conditioned upon maintenance of natural flow from Flathead Lake when needed. "(e) The Columbia Basin project can be supplied with practically no shortage without the aid of storage, with a dam at Grand Coulee about 156 feet high above low water. " (f) Information upon which to base a final decision between a gravity and a pumped supply for a Columbia Basin irrigation project is not...