Gambar halaman
PDF
ePub
[blocks in formation]

Kilbourn City bridge

55.000 00

Draw bridge, Milwaukee, $11,000; draw bridge,
Portage, $3,500

[blocks in formation]

Masonry and bridging N. La Crosse to Miss. river.. Culvert masonry, pile frame and timber culverts, road bridges, pile abutments, plank boxes and and drains, cattle guards, highway crossings, road signs and whistling posts...

195,000 00

$476,580 00

SCHEDULE 9.

$149,883 00 34, 010 00 800 00

$184,693 00

2,331 ms. spikes, F bars and bolts, @$643.
Extra cost of side tracks, 35, 8ms, @$950
2 R. R. crossings...

Amount.

Estimated cost of superstructure of one mile of main track.

944 tons iron rails, 60 b per 'yard de

[blocks in formation]

To laying and surfacing at S. G., loading and unloading

[blocks in formation]
[blocks in formation]
[blocks in formation]

9 switches, $150 each..

Cost of side track over main track......

Add for contingent waste and loss.

$950 00

$11,853

[blocks in formation]
[blocks in formation]

Totals

221,500 110, 100 9,400 64, 100 131,700 35,100 512,500

1 Furniture, twenty-eight stations. 2 Twenty-five cattle yards. Hand car houses.

[blocks in formation]

Laying track $400, ballasting $1,000....

54,362

[blocks in formation]

Total cash valuation of superstructure.

Passengers stations and fixtures, as per schedule

Freight stations and fixtures, as schedule.......
Wood sheds and water stations and miscellaneous,

Total cash valuation of buildings of every

425,873

14,700

...[No., 2]

4,800

[No., miles, 36]

28, 800

sort fencing, etc....

48,300

Engineering expenses before and during construc

tion...

29,600

Salaries of officers and agents essential during construction ...

Total cost of engineering and official management during construction....

6,100

35.700

Total cash value of line unequipped.....

$1,030,073

Two Railroad Crossing in Madison Depot Grounds.

[blocks in formation]

Culverts, bridges, road crossings and signs, cattle guards, etc...

$56,000

[blocks in formation]
[blocks in formation]

156,420

Iron rails: [No. miles, 118.5; lbs. wt. per yard, 60]
Chairs, spikes, fish-bars, etc., schedule* 9.
Laying track, $400; ballasting, $1,000...

893,490

90,885

165, 900

Total cash valuation of superstructure.

Passenger stations and fixtures, as per schedule.
Freight stations and fixtures, as per schedule..
Engine and car shops, as per schedule....

1,306, 695

102,400

Machine shops, as per schedule.....

[blocks in formation]

249, 100

35,000

3,600

[blocks in formation]
« SebelumnyaLanjutkan »