ESTIMATE OF COST OF 1-1200' LOCK (includes engineering, design,supervision administration and profit). Page/ 322,000 C.Y. 71,000 S.F.1,815,700 ESTIMATE OF COST OF 2-1200 LOCKS (including engineering, design, supervision administration and profit). Excavate trench & backfill for all cells. C.Y. 450,000 Page 4 3.00 1,350,000 C.Y. 3 Buy, place & drive permanent cells & cut offs. Compact fill for perm. cells & berm by vibrofloation. cells. 11 Load, transport & dump coffer fill in ยอ 14 cofferdan. 12 13 Buy and install permanent well points. Buy, place, drive & pull V-50 Z-pile Place,drive & pull 2-pile cofferdans 17 incl. for F.. incl. for P.. Place & remove fill for Z-pile cofferdans ཋ ཌ 8 མསྶ་* 8 8 6 Buy MP-101 piling for cofferdams within I.cells. Predrill for piling to be driven within I.W.cells. Place, drive and pull piling within I.W. cells. Buy, place & drive 12 BP 53 Concrete, valve monoliths. , filling & discharge culverts. |