Convention, Volume 5;Volume 39;Volume 62 |
Dari dalam buku
Hasil 1-3 dari 54
Halaman 222
... inches wide , including the buckle end , and shall be three - sixteenths ( 316 ) of an inch in thickness . The " D ... inches and shall be tapered to a point . It shall be sewed and double - riveted to the inside of the belt . The tool ...
... inches wide , including the buckle end , and shall be three - sixteenths ( 316 ) of an inch in thickness . The " D ... inches and shall be tapered to a point . It shall be sewed and double - riveted to the inside of the belt . The tool ...
Halaman 226
... inches in breadth , 16 inch in thickness and of such length as is designated in the accom- panying drawing for the required size of belt . The strap of the tool and safety belts shall be 2 inches in breadth , 5/16 inch thickness ; tool ...
... inches in breadth , 16 inch in thickness and of such length as is designated in the accom- panying drawing for the required size of belt . The strap of the tool and safety belts shall be 2 inches in breadth , 5/16 inch thickness ; tool ...
Halaman 271
... inches long were taken and marks two inches apart were spaced off at the middle of the sample . Each strip was then stretched until the test marks were six inches apart in the case of the all rubber gloves and three inches apart for the ...
... inches long were taken and marks two inches apart were spaced off at the middle of the sample . Each strip was then stretched until the test marks were six inches apart in the case of the all rubber gloves and three inches apart for the ...
Isi
PAGE | 5 |
INDICATING INSTRUMENT METHODS FOR TESTING CURRENT | 11 |
TWO WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
23 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention alternating current ammeter amperes apparatus belt boiler Bureau of Standards cable capacity cent Central Committee central power central station Chairman Chicago circuit City coal coil compound condenser conductors connected considerable construction cost current transformers deg fahr Diesel distribution duct efficiency electrification Employees energy engine equipment finger furnace fuse glove hydro-electric inches increase installed instrument transformers insulation interest joint lamps lightning arresters load manhole manufacturers member companies ment method Niagara Falls obtained operation Organization Overhead Line phase angle plants poles potentiometer Power Company power house practice present pressure primary pump railroad railway ratio recommendations rheostat River rubber secondary Secretary steam steam turbine stoker street substation supply temperature terminals TESCO tion trans transmission trouble tubes turbine United utilized voltage voltmeter volts water power water-power watthour meters wattmeter wire