Report of the Chief of Engineers U.S. Army, Volume 2,Bagian 1U.S. Government Printing Office, 1950 Includes the Report of the Mississippi River Commission, 1881-19 . |
Edisi yang lain - Lihat semua
Istilah dan frasa umum
1st sess 2d sess Accounts payable acre-feet appropriated for fiscal appropriated to June available for fiscal breakwater bridge Chief of Engineers Committee resolution Condition at end Cong construction Control Act approved Cost and financial Cost of maintenance Creek dredging end of fiscal ending June 30 Estimated additional amount expenditures to June feet deep financial summary Total fiscal year 1950 Fiscal year ending Flood Control Act Harbor Act hired labor July June 28 Lake Michigan locks and dams Los Angeles River low-water datum maintenance to June miles Mississippi River Missouri River Ohio River Ohio River Basin Operations and results operations.-The balance unexpended outer harbor percent complete pier plans and specifications project depth project was authorized Proposed operations.-The balance reservoir results during fiscal revetment River and Harbor summary Total amount Total amount appropriated total cost Total expended Total net expenditures Total unobligated balance turning basin Unexpended balance Unobligated balance available Wabash River
Bagian yang populer
Halaman 2105 - Act shall be expended on the construction of any project until States, political subdivisions thereof, or other responsible local agencies have given assurances satisfactory to the Secretary of War that they will (a) provide without cost to the United States all lands, easements, and rights-of-way necessary for the construction of the project...
Halaman 2126 - Mascaras, and various nonstructural measures, all generally in accordance with the plan of the District Engineer and with such modifications thereof as in the discretion of the Chief of Engineers may be advisable...
Halaman 1437 - That the following sums of money be, and are hereby, appropriated, to be paid out of any money in the Treasury not otherwise appropriated, to be immediately available, and to be expended under the direction of the Secretary of War and the supervision of the Chief of Engineers, for the construction, completion, repair, and preservation of the public works hereinafter named: ***** Sec.
Halaman 2115 - States of $625,000 for construction; provided local interests give assurances satisfactory to the Secretary of the Army...
Halaman 2060 - ... navigable streams and tributaries thereof when in the opinion of the Chief of Engineers such work is advisable in the interest of flood control: Provided, That not more than $25,000 shall be allotted for this purpose for any single tributary from the appropriations for any one fiscal year.
Halaman 1383 - California, is hereby authorized substantially in accordance with the plans contained in House Document Numbered 630, Seventy-sixth Congress, third session, with such modifications thereof as in the discretion of the Secretary of War and the Chief of Engineers may be advisable...
Halaman 2230 - The plane' of reference is mean lower low water. The range between mean lower low water and mean higher high water is 4.7 feet.
Halaman 1618 - Hereafter, it shall be the duty of the Secretary of War to prescribe regulations for the use of storage allocated for flood control or navigation at all reservoirs constructed wholly or In part with Federal funds provided on the basis of such purposes, and the operation of any such project shall be In accordance with such regulations...
Halaman 2351 - The range between mean lower low water and mean higher high water is 6.4 feet, with an extreme range of 10 feet.
Halaman 1383 - ILL. (Continuing) Location. — In St. Clair and Madison Counties, 111., on the left bank of Mississippi River between river miles 175 and 195 above the mouth of the Ohio River.