... steam or water power . Including these , it is estimated that the total water power developed at the present time is about 6,000,000 hp and the total steam power about 27,000,000 hp . Mr. Buck also points out how the coming of the steam ...
... steam or water power . Including these , it is estimated that the total water power developed at the present time is about 6,000,000 hp and the total steam power about 27,000,000 hp . Mr. Buck also points out how the coming of the steam ...
Halaman 358
... STEAM PRESSURES BY ROBERT CRAMER During the past year much discussion has taken place con- cerning the advent of higher steam pressures . These expressions are often merely opinions , at times they are prophecies pro- nounced with more ...
... STEAM PRESSURES BY ROBERT CRAMER During the past year much discussion has taken place con- cerning the advent of higher steam pressures . These expressions are often merely opinions , at times they are prophecies pro- nounced with more ...
Halaman 360
... steam superheated to a temperature of 600 deg fahr . is 13.4 per cent higher than the highest efficiency theoretically obtainable with the same vacuum , the same steam temperature , and a steam pressure of only 200 lb per sq - in . It ...
... steam superheated to a temperature of 600 deg fahr . is 13.4 per cent higher than the highest efficiency theoretically obtainable with the same vacuum , the same steam temperature , and a steam pressure of only 200 lb per sq - in . It ...
Isi
INTRODUCTION | 7 |
TWO WATTMETER METHOD FOR TESTING CURRENT TRANS | 13 |
Two WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
25 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention alternating current ammeter amperes apparatus belt boiler Bureau of Standards cable capacity cent Central Committee central power central station Chairman Chicago circuit City coal coil compound condenser conductors connected considerable construction cost current transformers deg fahr distribution duct efficiency electrification Employees energy equipment finger furnace fuse glove hydro-electric inches increase installed instrument transformers insulation interest joint lamps lightning arresters load manhole manufacturers member companies ment method Niagara Falls obtained operation Organization Overhead Line phase angle plants poles potentiometer Power Company power house practice present pressure primary pump railroad railway ratio recommendations rheostat River rubber Safety Code secondary Secretary steam steam turbine stoker street substation supply temperature terminals TESCO tion trans transmission trouble tubes turbine United utilized voltage voltmeter volts water power water-power watthour meters wattmeter wire