Convention, Volume 5;Volume 39;Volume 62 |
Dari dalam buku
Hasil 1-3 dari 55
Halaman 222
... inches in width . The loop for the snap shall be made by turning the strap back not less than six ( 6 ) inches , and it shall be sewed and double - riveted . The loop shall be reinforced by means of a three - sixteenths ( 16 ) inch ...
... inches in width . The loop for the snap shall be made by turning the strap back not less than six ( 6 ) inches , and it shall be sewed and double - riveted . The loop shall be reinforced by means of a three - sixteenths ( 16 ) inch ...
Halaman 226
... inches in breadth , 16 inch in thickness and of such length as is designated in the accom- panying drawing for the required size of belt . The strap of the tool and safety belts shall be 2 inches in breadth , 16 inch thickness ; tool ...
... inches in breadth , 16 inch in thickness and of such length as is designated in the accom- panying drawing for the required size of belt . The strap of the tool and safety belts shall be 2 inches in breadth , 16 inch thickness ; tool ...
Halaman 271
... inches long were taken and marks two inches apart were spaced off at the middle of the sample . Each strip was then stretched until the test marks were six inches apart in the case of the all rubber gloves and three inches apart for the ...
... inches long were taken and marks two inches apart were spaced off at the middle of the sample . Each strip was then stretched until the test marks were six inches apart in the case of the all rubber gloves and three inches apart for the ...
Isi
INTRODUCTION | 7 |
TWO WATTMETER METHOD FOR TESTING CURRENT TRANS | 13 |
Two WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
25 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention alternating current ammeter amperes apparatus belt boiler Bureau of Standards cable capacity cent Central Committee central power central station Chairman Chicago circuit City coal coil compound condenser conductors connected considerable construction cost current transformers deg fahr distribution duct efficiency electrification Employees energy equipment finger furnace fuse glove hydro-electric inches increase installed instrument transformers insulation interest joint lamps lightning arresters load manhole manufacturers member companies ment method Niagara Falls obtained operation Organization Overhead Line phase angle plants poles potentiometer Power Company power house practice present pressure primary pump railroad railway ratio recommendations rheostat River rubber Safety Code secondary Secretary steam steam turbine stoker street substation supply temperature terminals TESCO tion trans transmission trouble tubes turbine United utilized voltage voltmeter volts water power water-power watthour meters wattmeter wire