Convention, Volume 5;Volume 39;Volume 62 |
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Isi
STANDARDIZATION OF DESIGN AND MAINTENANCE METHODS | 8 |
Two WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
RECENT DEVELOPMENTS | 36 |
22 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention alternating current ammeter amperes apparatus belt boiler Bureau of Standards cable capacity cent Central Committee central power central station Chairman Chicago circuit City coal coil compound condenser conductors connected considerable construction cost current transformers deg fahr distribution duct efficiency electrification Employees energy equipment finger furnace fuse glove hydro-electric inches increase installed instrument transformers insulation interest joint lamps lightning arresters load manhole manufacturers member companies ment method Niagara Falls obtained operation Organization Overhead Line panies phase angle plants poles potentiometer Power Company power house practice present pressure primary pump railroad railway ratio recommendations rheostat River rubber Safety Code secondary Secretary steam steam turbine stoker street substation supply temperature terminals TESCO tion trans transmission trouble tubes turbine United utilized voltage voltmeter volts water power water-power watthour meter wattmeter wire