A Manual of Engineering Specifications and Contracts: Designed as a Text-book and Work Reference for All who May be Engaged in the Theory Or Practice of EngineeringHenry Carey Baird & Company, 1900 - 328 halaman |
Edisi yang lain - Lihat semua
Istilah dan frasa umum
abutments aforesaid allowed angle arch ashlar beams beds bidders bids boiler bolts bond brick bridge building cast-iron castings Cedar Keys cement centre Chief Engineer completion construction contract contractor cornice course cubic foot cubic yard diameter dimensions dollars doors drawings dressed embankment Engineer and Surveyor Engineer in charge estimates excavation face feet finished flanges floor foundation four Frustrum furnished grade headers hereby inches inches thick joints joists Kanawha River laid length less masonry material measured mortar necessary parties payment pier piles pipes placed plans plate pounds proposals rail Railroad removed rip-rap riveted road rock roof rubble sample car sand sash scabbled seal Section secured sewer shafts shown side sills slopes span specific gravity specifications square inch stone stringers surface terra cotta timber tions track transepts trusses vertical wall water closet weight wheels white pine width wood wrought iron
Bagian yang populer
Halaman 9 - Lest haply after he hath laid the foundation, and is not able to finish it, all that behold it begin to mock him, saying, This man began to build, and was not able to finish.
Halaman 207 - All purchases and contracts for supplies or services, in any of the Departments of the Government, except for personal services, shall be made by advertising a sufficient time previously for proposals respecting the same, when the public exigencies do not require the immediate delivery of the articles, or performance of the service.
Halaman 249 - No contract shall be entered into for the erection, repair, or furnishing of any public building, or for any public improvement which shall bind the government to pay a larger sum of money than the amount in the Treasury appropriated for the specific purpose.
Halaman 268 - And the said party of the second part, for himself, his executors, administrators, and assigns, does hereby covenant and agree, to and with the said parties of the first part...
Halaman 271 - Eight hundred and by and between party of the first part, and party of the second part. Witnesseth, That for and in consideration of the payments and covenants hereinafter mentioned to be made and performed by the said party of the second part...
Halaman 280 - ... the decision of the Chief Engineer of the said Railroad shall be final and conclusive in any dispute which may arise between the parties...
Halaman 251 - I do solemnly swear (or affirm) that the copy of contract hereto annexed is an exact copy of a contract made by me personally with ; that I made the same fairly, without any benefit or advantage to myself, or allowing any such benefit or advantage corruptly to the said •, or any other person; and that the papers accompanying include all those relating to the said contract, as required by the statute in such case made and provided.
Halaman 25 - Eight hours shall constitute a day's work for all laborers, workmen and mechanics who may be employed by or on behalf of the Government of the United States.
Halaman 228 - Assigns, for the which payment well and truly to be made and done, we bind ourselves, our Heirs, Executors and Administrators jointly and severally, firmly by these presents, sealed with our seals, and dated this 23d day of May AD l8l2.
Halaman 251 - Payment well and truly to be made, we bind ourselves, and each of us, our, and each of our Heirs, Executors and Administrators jointly and severally, firmly by these Presents.