234,000 cubic yards embankment on west shore, Raising toll-keeper's house, 3,600 cubic yards excavation for two viaducts 7,00 143,605 2,00 120 ,12 ,35 2233 2,160 99,400 250 on Island, ,12 432 135,000 feet, board measure, of timber in founda For raising the bridge on the present towers, so as to give a clear headway, over the channel, of one hundred feet above the level of zero of the gauge at Wheeling. Taking down the old cables and putting them up Repairing and repainting cables, Replacing fastening bolts which can not be re- 56,000 pounds of iron, lengthening cables and suspenders, $1,688 500 500 $00,12 6,720 Note. s of Cables and Platforms correspond with the nr. ition of the proposed alteration of the Platforms e 60 cubic yards masonry, cellar wall of house, 15,000 cubic yards excavation for west wings, &c. 15,000 cubic yards embankment on west shore, Raising toll-keeper's house, Total cost of this plan, 7,00 12,600 and wit EIGHTH PLAN. For raising the bridge, so as to give a clear headway, over the channel, f one hundred and twenty feet, above the level of zero of the gauge at the PlayWheeling. Taking down the old cables and putting them up Repairing and repainting cables, Replacing fastening bolts which can not be re- $1,688 500 500 $00,12 4,020 30,00 6,000 250 81,000 cubic yards embankment on west shore, ,35 28,350 150 Amount carried forward, 187,239 50 63,000 feet, board measure, timber and plank in FIRST MODIFICATION OF THE THIRD PLAN. Commencing the eastern approach at the grade of Market-street, and bridging over Main-street, and thence over Madison-street to the east Repairing and repainting cables, Replacing fastening bolts which can not be re- 66,500 pounds of iron, lengthening cables and suspen- Taking down and replacing the wood 2,000 cubic yards excavation on east shore un $1,688 500 500 $00,12 7,980 30,00 7,200 250 der the bridge, ,20 2,000 cubic yards embankment, grading Madi son-street, ,20 3,000 square yards pavement taken up and re placed, 223 400 400 ,30 900 60 cubic yards masonry, cellar wall of house, 16,000 cubic yards excavation for west wings, etc. 54,000 cubic yards embankment on west shore, 2,00 120 |