234,000 cubic yards embankment on west shore, Raising toll-keeper's house,

3,600 cubic yards excavation for two viaducts

7,00

143,605

2,00

120

,12

,35

2233

2,160

99,400

250

on Island,

,12

432

135,000 feet, board measure, of timber in founda

[blocks in formation]

For raising the bridge on the present towers, so as to give a clear headway, over the channel, of one hundred feet above the level of zero of the gauge at Wheeling.

Taking down the old cables and putting them up
again,

Repairing and repainting cables,

Replacing fastening bolts which can not be re-
moved, and other extra work about do.

[ocr errors]

56,000 pounds of iron, lengthening cables and suspenders,

$1,688

500

500

$00,12

6,720

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small]

Note.
for Figures 1,2 and 3.

s of Cables and Platforms correspond with the nr. ition of the proposed alteration of the Platforms e

[merged small][graphic][subsumed]
[graphic][subsumed][subsumed]
[merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

60 cubic yards masonry, cellar wall of house, 15,000 cubic yards excavation for west wings, &c. 15,000 cubic yards embankment on west shore, Raising toll-keeper's house,

Total cost of this plan,

7,00

12,600

[merged small][merged small][subsumed][ocr errors][subsumed][merged small][merged small][merged small][merged small]

and wit

EIGHTH PLAN.

For raising the bridge, so as to give a clear headway, over the channel, f one hundred and twenty feet, above the level of zero of the gauge at the PlayWheeling.

Taking down the old cables and putting them up

[merged small][ocr errors]

Repairing and repainting cables,

Replacing fastening bolts which can not be re-
moved, and other extra work about do.

[ocr errors]
[merged small][merged small][ocr errors][merged small][ocr errors][merged small]

$1,688

500

500

[ocr errors]

$00,12

4,020

30,00

6,000

250

[blocks in formation]

81,000 cubic yards embankment on west shore,
Raising toll-keeper's house,

,35

28,350

150

Amount carried forward,

187,239 50

[blocks in formation]

63,000 feet, board measure, timber and plank in

[blocks in formation]

FIRST MODIFICATION OF THE THIRD PLAN.

Commencing the eastern approach at the grade of Market-street, and bridging over Main-street, and thence over Madison-street to the east

[merged small][merged small][merged small][ocr errors]

Repairing and repainting cables,

Replacing fastening bolts which can not be re-
moved, and other extra work about do.

[ocr errors]

66,500 pounds of iron, lengthening cables and suspen-
ders,

Taking down and replacing the wood
platform, and extending it, 24,000 feet,
board measure, timber and plank,
Painting do. and other incidental work,

2,000 cubic yards excavation on east shore un

$1,688

500

500

$00,12

7,980

[ocr errors]

30,00

7,200

250

der the bridge,

,20

2,000 cubic yards embankment, grading Madi

son-street,

,20

3,000 square yards pavement taken up and re

placed,

223

400

400

,30

900

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][ocr errors][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

60 cubic yards masonry, cellar wall of house, 16,000 cubic yards excavation for west wings, etc. 54,000 cubic yards embankment on west shore,

2,00

120

[merged small][merged small][merged small][merged small][merged small][ocr errors][merged small]
« SebelumnyaLanjutkan »