Gambar halaman
PDF
ePub

Job and occupational mobility in 1976 and 1978. The data on mobility between 1976 and 1978 were derived from answers on both the 1976 and 1978 questionnaires. Persons were classified as with a "job change between 1976 and 1978" if they were employed in both 1976 and 1978 and reported in the 1978 survey that their current job began in 1976 or later. Persons were classified as "same job in 1976 and 1978" if the beginning date of their most recent job was in 1975 or earlier, and as "not reported" if they did not report the beginning date of the most recent job. For persons with a job change, the detailed occupation of the 1978 job was compared with that of the 1976 job, and persons were classified as with the same or a different occupation or as "occupation change not reported."

Job and occupational mobility in 1974 and 1978 and in 1972 and 1978. The data on mobility between 1974 and 1978 and between 1972 and 1978 were derived from answers on the 1974 and 1978 questionnaires and 1972 and 1978 questionnaires, respectively. The procedure was analogous to that described for the data on job and occupational mobility in 1976 and 1978.

Years of professional experience. Median years of professional experience are based on 1-year intervals. Symbols. A dash (-) represents zero, and "X" means "not applicable." The symbol "Z" means less than 0.05 percent. The symbol "*" means based on fewer than 20 sample cases. For the characteristic "Unemployment in Calendar Year 1977," the symbol "27+" means that the median fell in the category "27 weeks or more."

Appendix B. Reliability of the Estimates and Standard Errors

of Totals and Percentages

There are two types of possible errors associated with estimates based on data from a sample survey-sampling and nonsampling error. The following is a description of the sampling and nonsampling errors associated with the 1978 Survey of Scientists and Engineers.

SAMPLING ERRORS

The particular sample used for this survey is one of a large number of possible samples of the same size that could have been selected using the same sample design. Even if the same schedules and instructions were used, estimates from each of the different samples would differ from each other. The deviation of a sample estimate from the average of all possible samples is defined as the sampling error. The standard error of a survey estimate attempts to provide a measure of this variation among the estimates from the possible samples, and thus, is a measure of the precision with which an estimate from the sample approximates the average result of all possible samples.

As calculated for this survey, the standard error also partially measures the variation in the estimates due to response errors (nonsampling errors), but it does not measure, as such, any systematic biases in the data. Therefore, the accuracy of the estimates depends on both the sampling and nonsampling errors, measured by the standard error, and biases and some additional nonsampling errors not measured by the standard error.

The figures presented in the tables B-1 to B-4 below are approximations to the standard errors of the various estimates for this survey. A number of approximations and generalizations have been used so that the standard errors would be applicable to a wide variety of characteristics and still be prepared at a moderate cost. Thus, the standard errors in the following tables provide an indication of the order of magnitude rather than precise measurements of the standard errors.

Standard errors on totals. Table B-1 presents the standard errors applicable to estimated totals for characteristics of physical scientists. Linear interpolation can be used to determine standard errors for estimated totals not specifically shown in table B-1. In addition, standard errors for estimated numbers not shown in these tables may also be computed directly from the following standard error formula:

[blocks in formation]
[blocks in formation]

Standard errors on percentages. The reliability of an esti mated percentage, computed by using sample data for both the numerator and the denominator, depends upon both the size of the percentage and the size of the total upon which the percentage is based. Estimated percentages are relatively more reliable than the corresponding estimates of the nu merators of the percentage, particularly if the percentages are 50 percent or more.

Tables B-2 to B-4 present the standard errors of estimated percentages for physical scientists. Two-way linear interpolation can be used to determine standard errors for estimated percentages not specifically shown in tables B-2 to B-4. In addition, the standard errors for percentages not shown in these tables can also be computed directly from the following formula1:

standard error of the percentage p on a base of y

[blocks in formation]
[blocks in formation]

Standard error intervals. The sample estimate and its estimated standard error enable one to construct interval estimates that include the average result of all possible samples with a known probability. For example, if all possible samples were selected, each of these surveyed under identical conditions and an estimate and its estimated standard error were calculated from each sample, then:

1. Approximately 68 percent of the intervals from one standard error below the estimate to one standard error above the estimate would include the average result of all possible samples;

2. Approximately 90 percent of the intervals from 1.6 standard errors below the estimate to 1.6 standard errors above the estimate would include the average result of all possible samples;

3. Approximately 95 percent of the intervals from two standard errors below the estimate to two standard errors above the estimate would include the average result of all possible samples.

The average result of all possible samples either is or is not contained in any particular computed interval. However, for a particular sample one can say with specified confidence that the average result of all possible samples is included within the constructed interval.

For example, of the 129,918 physical scientists, total, in 1978,17.5 percent have the Master's degree as the highest degree held in 1978. The standard error of this percent as computed from table B-2 is .6 percentage points. Based on these data, we may conclude that the percentage of physical scientists, total, with the Master's degree as the highest degree held in 1978 lies between 16.3 percent and 18.7 percent with 95 percent confidence, i.e., within 2 standard errors.

All the statements of comparison appearing in the text of this report are significant at a level of more than 2.0 standard errors. This means that for the differences cited in the text, the estimated difference is greater than twice the standard error of the difference.

Standard errors of differences between estimates. The figures in these tables are not directly applicable to standard errors of differences between two sample estimates. The standard error of the estimated difference between two figures may be approximated by the square root of the sum of the squares of the standard error of each estimate. This approximation will yield an exact result when the two characteristics are uncorrelated. If the two characteristics are positively (negatively) correlated, the approximation will overestimate (underestimate) the standard error of the difference. For a difference between two sample estimates, one of which

[blocks in formation]

Standard errors of medians. The figures in these tables are not directly applicable to standard errors of estimated me- . dians. The sampling variability of an estimated median depends upon the size of the base as well as on the distribution from which the median is determined. An approximate method for measuring the reliability of a median is to determine an interval about the estimated median, such that there is a stated degree of confidence that the median based on all possible samples lies within the interval. The following procedure may be used to estimate confidence limits of a median based on sample data:

1. Determine the standard error of a 50-percent characteristic from the appropriate standard error table (tables B-2 to B-4) using the appropriate base;

2. Add this standard error to 50 percent to obtain an upper boundary percentage and subtract this standard error from 50 percent to obtain a lower boundary percentage;

3. Using the cumulative distribution from which the median is derived, read off the numbers corresponding to the percentages. The interval between these two numbers (i.e., the confidence limits) will be the 68-percent confi

dence interval. A 95-percent confidence interval may be determined by finding the values corresponding to 50 percent plus or minus twice the standard error in step (1).

Table B-2. Standard Errors of Percentages for Physical Scientists, Total, and Physicists/Astronomers

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

Table B-3. Standard Errors of Percentages for Other Physical Scientists

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]
[blocks in formation]

as shown by the data, is from 45.6 years to 46.3 years. Likewise, we could conclude that the 95 percent confidence interval is from 45.2 years (the distribution point corresponding to 48.0 percent) to 46.6 years (corresponding to 52.0 percent).

NONSAMPLING ERRORS

In general, nonsampling errors can be attributed to many sources: inability to obtain information about all cases; definitional difficulties; differences in the interpretation of questions; inability or unwillingness to provide correct information on the part of the respondents; mistakes in recording or coding the data; and other errors of collection, response, processing, coverage, and estimation for missing data. As the above list indicates, nonsampling errors are not unique to sample surveys, since they can, and do, occur in complete censuses as well.

The primary source of nonsampling error in the 1978 National Sample survey is probably the high non response rate. An adjustment in the estimation procedure for the 23percent noninterview rate in the 1972 survey and the addi tional 19-percent nonresponse rate in 1978 was made, but there still remains some unknown bias in the estimates due to differences in the characteristics of those who were interviewed in 1978 and those who were not.

It should also be pointed out that estimates for this survey do not represent those who have entered the labor force in scientific and engineering fields since 1970. In particular, this survey does not include the large numbers of graduates produced since 1970. This causes significant biases for such items as the relative distributions of sex, age, and race and the unemployment figures if the results are assumed to be indicative of the current scientific and engineering fields including new entrants since 1970.

« SebelumnyaLanjutkan »