Convention, Volume 2;Volume 32 |
Dari dalam buku
Hasil 1-3 dari 85
Halaman 123
... possible , and , second , to cool the air entering the pump and remove from it as much of the water vapor as possible . The first question is one of careful attention and inspection , and is often a very greatly neglected point in plant ...
... possible , and , second , to cool the air entering the pump and remove from it as much of the water vapor as possible . The first question is one of careful attention and inspection , and is often a very greatly neglected point in plant ...
Halaman 127
... possible . This in turn requires that the temperature of the water leaving the condenser and entering the tower be raised as nearly as possible to the temperature of the exhaust steam . For a given range in temperature in the tower it ...
... possible . This in turn requires that the temperature of the water leaving the condenser and entering the tower be raised as nearly as possible to the temperature of the exhaust steam . For a given range in temperature in the tower it ...
Halaman 131
... possible so that full advantage can be taken of winds to aid the draft created in the towers . Where set in open spaces it is advisable to have the sides , or at least a portion of each side , equipped with removable doors so that the ...
... possible so that full advantage can be taken of winds to aid the draft created in the towers . Where set in open spaces it is advisable to have the sides , or at least a portion of each side , equipped with removable doors so that the ...
Isi
Conventions of the Association lxi | xiii |
Second Accounting Session | 74 |
Second Session | 134 |
12 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
alternating-current amount Anthracite apparatus arc lamps average boiler bolts braces buckets cable capacity carbon cent central station CHAIRMAN charge circuits City coal coils committee condenser connected construction Consumer contract copper cost cross-arm curve customers discussion distribution EDISON COMPANY efficiency Elec ELECTRIC LIGHT ASSOCIATION equipment feet Figure fixture galvanized gas engine guy wire heat horse-power illumination inches increase installation insulation iron kilowatt-hour kilowatts lightning arresters Lignite line wire load factor located low-pressure machine manufacturers meter method motor motor-generator NATIONAL ELECTRIC LIGHT obtained operating overhead line paper pins pipe plant pole possible pounds power factor practice pressure producer pump Rateau reactance secondary shaft shown in Plate shows space specifications standard station load steam steel strain strain insulators supply surface condenser synchronous temperature tests tion transformers tungsten lamp turbine voltage volts watts