" ... for safety and adequacy. The names and qualifications of the Board members shall be submitted to the Director, Office of Electric Power Regulation, for approval. Among other things, the Board shall assess the geology... "
Operating Manual for Inspection of Projects and Supervision of Licenses for ... - Halaman 5-9
1998
Tampilan utuh - Tentang buku ini

Public Works for Water and Power Development and Energy ..., Volume 6;Volume 104

United States. Congress. House. Committee on Appropriations. Subcommittee on Public Works - 1978 - 1022 halaman
...and adequate structures. Each licensee for an unconstructed project is required to retain a board of consultants to review the design, specifications,...construction of the project for safety and adequacy. Commission staff monitors the activities of the board, and makes special inspections to assess the...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 1979 - 1358 halaman
...changes in the plans and specifications to assure the safety and adequacy of project works. Article 44. The Licensee shall retain a Board of three or more...design, specifications, and construction of the project works for safety and adequacy. The names and qualifications of the Board members shall be submitted...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 2160 halaman
...the rERC Reporto огз »о design, construction, and maintenance of these facilities. Article 50. The Licensee shall retain a Board of three or more...the design, specifications, and construction of the Balsam Meadow Development for safety and adequacy. The names and qualifications of the Board members...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 1922 halaman
...construction procedures for cofferdams and deep excavations. Article 36 requires KRCD to retain a board of independent engineering consultants to review the...construction of the project for safety and adequacy, and to file with the Director, Office of Electric Power Regulation, copies of the board's report prior...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 1422 halaman
...Regulaany modifications -,, it shall prompt of those persons. The ht to require modificaprocedures. shall retain a Board of three or more qualified, independent engineering consultants to review for safety and adequacy, the design, specifications, and construction of the new powerhouse, tunnel,...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 1320 halaman
...specifications so as to assure a safe and adequate dam. Article 40. The Licensees shall retain a Board of two or more qualified, independent engineering consultants to review the design, specifications, and reconstruction of Henshaw Dam for safety and adequacy. The names and qualifications of the Board members...
Tampilan utuh - Tentang buku ini

Federal Energy Regulatory Commission Reports

United States. Federal Energy Regulatory Commission - 1196 halaman
...appropriate changes to the plans and specifications to assure a safe and adequate project. Article 31. The Licensee shall retain a Board of three or more qualified independent consultants to review the safety and adequacy of all features of the project as proposed for modification....