Operating Manual for Inspection of Projects and Supervision of Licenses for Water Power ProjectsFederal Energy Regulatory Commission, 1998 |
Edisi yang lain - Lihat semua
Istilah dan frasa umum
additional adequacy adequate agencies analysis Appendix applicant or licensee appropriate IDF approved boat barriers boat restraining barriers boaters cofferdam Commission's Regulations compliance construction inspection Construction Report consultant's D2SI dam break dam safety determine DIRTBAG discussed Division of Dam document downstream embankment dams emergency action plan Energy Regulatory Commission Engineering Guidelines ensure EPUI evaluation exempted projects facilities factors of safety failure Federal Energy Regulatory Federal Power Act FERC filed flowchart follow-up hazardous areas hydroelectric identify independent consultant inspecting engineer inspection report installed instrumentation inundation map licensed and exempted licensee's licensee/exemptee located monitoring necessary notification penstock personnel photographs plans and specifications powerhouse procedures project owner project structures Public Safety Plan QCIP quality control recreation Regional Director Regional Engineer Regional Office reservoir responsible safety devices Section SFRO Small Hydro spillway gates staff submitted subpart tainter gates warning signs
Bagian yang populer
Halaman 11 - That the licensee shall maintain the project works in a condition of repair adequate for the purposes of navigation and for the efficient operation of said works in the development and transmission of power, shall make all necessary renewals and replacements, shall establish and maintain adequate depreciation reserves for such purposes...
Halaman 11 - ... conform to such rules and regulations as the commission may from time to time prescribe for the protection of life, health, and property.
Halaman 11 - Such maps, plans, specifications and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans and specifications when approved by the commission shall be made a part of the license; and thereafter no...
Halaman 11 - ... when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans shall be made to any dam or other project works constructed hereunder...
Halaman 11 - Such maps, plans, specifications, and estimates of cost as may be required for a full understanding of the proposed project. Such maps, plans, and specifications when approved by the commission shall be made a part of the license; and thereafter no change shall be made in said maps, plans, or specifications until such changes shall have been approved and made a part of such license by the commission.
Halaman 11 - That except when emergency shall require for the protection of navigation, life, health, or property, no substantial alteration or addition not in conformity with the approved plans...
Halaman 4-2 - In order to determine whether there are any deficiencies or potential deficiencies in the condition of project structures, quality and adequacy of maintenance or methods of operation which might endanger public safety. Such inspections shall provide pertinent data with respect, but not limited, to such matters as settlement, movement, erosion, seepage, leakage, cracking, examination of internal conditions of stress and hydrostatic pressures in structures, their foundations and abutments, functioning...