Final Survey Study for Great Lakes and St. Lawrence Seaway Navigation Season Extension: Main report and final environmental impact statementU.S. Army Engineer District, Detroit, Corps of Engineers, 1979 |
Edisi yang lain - Lihat semua
Istilah dan frasa umum
31 January activities Adaptive Method addition alternative Annual Appendix areas assessment authorized benefits Canada Canadian Clair and Detroit Clair River connecting channels construction coordination Corps of Engineers costs Demonstration Program Detroit River dredging economic Environmental Plan EPOA evaluation extend the navigation extended navigation season extended season navigation facilities Federal Fish and Wildlife four Great Lakes harbors ice booms ice conditions ice control structures ice jams icebreaking identified improvements International Section Joint Board Lake Erie Lake Huron Lake Ontario Lake Superior Lakes Basin Lakes/St Lawrence River Lawrence Seaway Development Lawrence Seaway System levels and flows lock maintenance Marys River Michigan monitoring navigation season extension operation Phase I GDM Plan of Action potential proposed recommended plan regional result Sault Ste Season Extension Program shore erosion shoreline Soo Locks U.S. Army Corps U.S. Coast Guard U.S. Fish upper four Validation Report water levels Welland Canal year-round
Bagian yang populer
Halaman 115 - This load could be carried without difficulty by three generators of 900 kilowatts each, so as to comply with the American Bureau of Shipping rules for building and classing steel vessels...
Halaman 4 - Tiering refers to the coverage of general matters in broader environmental impact statements (such as national program or policy statements) with subsequent narrower statements or environmental analyses (such as regional or basinwide program statements or ultimately site-specific statements) Incorporating by reference the general discussions and concentrating solely on the issues specific to the statement subsequently prepared.
Halaman 12 - ... the US Fish and Wildlife Service of the Department of the Interior, the National Marine Fisheries Service of the Department of Commerce...
Halaman 3 - ... collection of technical data related to improved vessel design; ice control facilities, and aids to navigation; physical model studies; and coordination of the collection and dissemination of information to shippers on weather and ice conditions.
Halaman 126 - Air bubbler systems are planned for tight turns along the St. Marys River; namely, at Birch and Brush Point Angle Courses where waters from Whitefish Bay enter into the river; at Angle...
Halaman 17 - To enhance the quality of the environment by the management, conservation, preservation, creation, restoration, or improvement of the quality of certain natural and cultural resources and ecological systems.
Halaman 158 - ... of Engineers for Rivers and Harbors. The study concludes that season extension is engineeringly and economically feasible and recommends extension year-round on the upper three Great Lakes, up to yearround on the St. Clair River-Lake St. Clair-Detroit River System and Lake Erie, and up to 10 months on Lake Ontario and the International Section of the St. Lawrence River, to be implemented in phases. It is recognized that formal agreement with the Government of Canada is required for any extension...
Halaman 3 - Non-Federal public and private interests, is authorized and directed to undertake a program to demonstrate the practicability of extending the navigation season on the Great Lakes and St. Lawrence Seaway.
Halaman 49 - Guard have participated in a federally sponsored program to demonstrate the practicability of extending the navigation season on the Great Lakes-St. Lawrence Seaway System and to identify the necessary resources for permanent extension.
Halaman 12 - Act of 1958, as amended, states that fish and wildlife conservation shall receive equal consideration with other project purposes and be coordinated with other features of water- resources development programs.