Map No. 3. DEPARTMENT OF ENGINEERING Suganville OUTLINE MAP OF STATE HIGH WAY SYSTEM HIGHWAYS PROPOSED UNDER 3 BOND ISSUE 1919. 16 Tabulations of Highway Construction 2.4 Tables No. 1 and No. 2 following give the total mileage of paved and graded highways completed to June 30, 1920. 1920. Table No. 3 is a summation of highways under contract but not completed on June 30, In connection with completed highway construction it is of interest to note the following bridge expenditures on the State Highway system: The following is the status of the complete present day highway program as of June 30, 1920: Paved highways completed or under construction Total... Approximately 200 miles of county built highways have been taken Grand total Miles 1,580.71 732.54 3,246.75 5,560,00 200.00 5,760.00 Paved and Graded roads including highways constructed by Counties and subsequently incorporated into State System. CONCRETE BASE WITH ASPHALT SURFACE TABLE I. (1.) This mileage does not include approximately 750 miles graded road taken over from the State Department Engineering. 76.38 MILES " _16.26 204.96 " 16.45 400.33 (1) " 2007. 21 |