" The Contract Documents are complementary, and what is called for by any one shall be as binding as if called for by all. The intention of the documents is to include all labor and materials, equipment and transportation necessary for the proper execution... "
The Law of Architecture and Building: A Consideration of the Mutual Rights ... - Halaman 224
oleh Clinton Hamlin Blake - 1916 - 314 halaman
Tampilan utuh - Tentang buku ini

Radford's Estimating and Contracting: A Practical Manual of Up-to-date ...

William A. Radford - 1913 - 912 halaman
...produced by him at his office on demand of either party. Article 2. The documents forming the Contract are complementary, and what is called for by any one shall be as binding as If called for by all. They are intended to include all detail of labor and material reasonably necessary for the proper execution...
Tampilan utuh - Tentang buku ini

Management Engineering: The Design and Organization of Industrial Plants ...

Perley F. Walker - 1924 - 380 halaman
...Engineer shall identify them. The Contract Documents are complementary, and what is called for by anyone shall be as binding as if called for by all. The intention...the documents is to include all labor and materials, equipment and transportation reasonably necessary for the proper execution of the work. It is not intended,...
Tampilan utuh - Tentang buku ini

Water Works Practice

American Water Works Association - 1925 - 824 halaman
...fail to sign the General Conditions, Drawings or Specifications, the Engineer shall identify them. The Contract Documents are complementary, and what...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It is not intended, however,...
Tampilan utuh - Tentang buku ini

Water Works Practice

American Water Works Association - 1925 - 882 halaman
...Conditions, Drawings or Specifications, ' -ie Engineer shall identify them. The Contract Documen1 j are complementary, and what is called for by any one...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It ia not intended, however,...
Tampilan utuh - Tentang buku ini

Acquiring a Home

Clinton H. Blake (Jr) - 1925 - 314 halaman
...Architect shall identify them. The Contract Documents are complementary, and what is called for by anyone shall be as binding as if called for by all. The intention of the documents is to include all labour and materials reasonably necessary for the proper execution of the work. It is not intended...
Tampilan utuh - Tentang buku ini

Water Works Practice

American Water Works Association - 1926 - 852 halaman
...fail to sign the General Conditions, Drawings or Specifications, the Engineer shall identify them. The Contract Documents are complementary, and what...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It is not intended, however,...
Tampilan utuh - Tentang buku ini

Drugs, Law Enforcement, and Foreign Policy: The Cartel, Haiti, and Central ...

United States. Congress. Senate. Committee on Foreign Relations. Subcommittee on Terrorism, Narcotics, and International Communications - 1927 - 862 halaman
...are used synonymously in this contract. Article 2. Execution, Correlation and Intent of Document». The contract documents are complementary, and what...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It is not intended, however,...
Tampilan utuh - Tentang buku ini

Concrete Building Construction

Theodore Crane - 1927 - 766 halaman
...Conditions, Drawings or Specifications, the Architect shall identify them. The Contract Documents arc complementary, and what is called for by any one shall...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It is not intended, however,...
Tampilan utuh - Tentang buku ini

School Building Problems

George Drayton Strayer, Nickolaus Louis Engelhardt - 1927 - 728 halaman
...Conditions, Drawings, or Specifications, the Architect shall identify them. The Contract Documents arc complementary, and what is called for by any one shall...the documents is to include all labor and materials, equipment, and transportation necessary for the proper execution of the work. It is not intended, however,...
Tampilan utuh - Tentang buku ini

Concrete Building Construction

Theodore Crane - 1927 - 718 halaman
...identify them. The Contract Documents arc complementary, and what is called for by any one shall be ai binding as if called for by all. The intention of...the documents is to include all labor and materials, equipment and transportation necessary for the proper execution of the work. It is not intended, however,...