All attempts to balance the turbine so as to suppress vibration seem to have failed , and when the conditions of load demanded an increase in equipment advantage was taken of the opportunity to make a complete change in the arrangement ...
All attempts to balance the turbine so as to suppress vibration seem to have failed , and when the conditions of load demanded an increase in equipment advantage was taken of the opportunity to make a complete change in the arrangement ...
Halaman 72
This equipment represents a step beyond the " peek - a - boo " benchboard in that each panel is an individual pedestal , separated from its neighbor by a distance of approximately 4 feet . Seven of these pedestals with the synchronizing ...
This equipment represents a step beyond the " peek - a - boo " benchboard in that each panel is an individual pedestal , separated from its neighbor by a distance of approximately 4 feet . Seven of these pedestals with the synchronizing ...
Halaman 74
Several substations have already been built along these lines , and a description of these buildings and their equipment illustrates the general practice followed . It is recommended , first of all , that customers ' substation ...
Several substations have already been built along these lines , and a description of these buildings and their equipment illustrates the general practice followed . It is recommended , first of all , that customers ' substation ...
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Edisi yang lain - Lihat semua
Istilah dan frasa umum
addition advantage amount Association attention average battery better building carried cent central station Chairman charge Class Commission Committee Company Company Sections connected consideration considered Convention cost course customers desirable Edison educational effect efficiency Electric Company Electric Light electric vehicle employees energy engineering entire equipment expense Exposition fact field garage give given heating important increase industry installed interest kw-hr lamps lines load machine manager manufacturers matter meetings method miles month motor municipal necessary obtained operating organization placed plant possible practically present President public utility question railway rates reason received representative result secured served steam Street successful supply taken technical tion trucks United utility various wiring York