Convention, Volume 2;Volume 38;Volume 54 |
Dari dalam buku
Hasil 1-3 dari 47
Halaman 68
In addition to the time consumed in assigning contracts for equipment , material and labor , and in actual construction , there are usually numerous delays brought about by bad weather , failure of material to arrive , labor conditions ...
In addition to the time consumed in assigning contracts for equipment , material and labor , and in actual construction , there are usually numerous delays brought about by bad weather , failure of material to arrive , labor conditions ...
Halaman 107
The main motor , connected to the roll train through a single herringbone reducing gear , will be a 1500 - hp , 2200 - volt , 60 - cycle machine operating at 210 r.p.m. In addition to this unit there will be about 200 hp in crane motors ...
The main motor , connected to the roll train through a single herringbone reducing gear , will be a 1500 - hp , 2200 - volt , 60 - cycle machine operating at 210 r.p.m. In addition to this unit there will be about 200 hp in crane motors ...
Halaman 170
The interest which the construction men have taken in cooperating with the company in this first - aid and safety work was made evident not long ago when one of the foremen made application for two additions to his first - aid kit .
The interest which the construction men have taken in cooperating with the company in this first - aid and safety work was made evident not long ago when one of the foremen made application for two additions to his first - aid kit .
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Edisi yang lain - Lihat semua
Istilah dan frasa umum
addition advantage amount Association attention average battery better building carried cent central station Chairman charge Class Commission Committee Company Company Sections connected consideration considered Convention cost course customers desirable Edison educational effect efficiency Electric Company Electric Light electric vehicle employees energy engineering entire equipment expense Exposition fact field garage give given heating important increase industry installed interest kw-hr lamps lines load machine manager manufacturers matter meetings method miles month motor municipal necessary obtained operating organization placed plant possible practically present President public utility question railway rates reason received representative result secured served steam Street successful supply taken technical tion trucks United utility various wiring York