Convention, Volume 5;Volume 39;Volume 62 |
Dari dalam buku
Hasil 1-3 dari 45
Halaman 9
The terminals shall be so marked that when connection is made to a secondary terminal bearing the same marking as a given primary terminal , the polarity will be the same as if the primary service conductor itself were detached from the ...
The terminals shall be so marked that when connection is made to a secondary terminal bearing the same marking as a given primary terminal , the polarity will be the same as if the primary service conductor itself were detached from the ...
Halaman 77
In about 80 per cent of these cases of trouble we were able to find marks on the transformer case or on the primary terminal board where the arc had jumped across between primary terminals , or from primary terminals to the cover ...
In about 80 per cent of these cases of trouble we were able to find marks on the transformer case or on the primary terminal board where the arc had jumped across between primary terminals , or from primary terminals to the cover ...
Halaman 495
495 STANDARDIZATION OF TERMINAL MARKINGS FOR TRANSFORMERS At the request of the Standards Committee of the American Institute of Electrical Engineers , your Committee has co - operated in the preparation of a system of terminal markings ...
495 STANDARDIZATION OF TERMINAL MARKINGS FOR TRANSFORMERS At the request of the Standards Committee of the American Institute of Electrical Engineers , your Committee has co - operated in the preparation of a system of terminal markings ...
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Isi
TWO VOLTMETER METHOD FOR TESTING POTENTIAL TRANS | 16 |
TWO WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
RECENT DEVELOPMENTS | 36 |
19 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention accidents amount apparatus arresters Association belt bill boiler Bureau cable capacity carried cause cent central circuit City coal Committee companies complete connected considerable considered construction cost desirable determined discussion distribution effect efficiency electric Employees energy engine equipment Falls finger give given glove hand important inches increase indicate installed insulation interest joint lamps lead less light load manufacturers material matter means measured meetings meter method necessary obtained operation Organization phase placed plants poles possible practice present pressure production protection railroad ratio reason recommendations River rules safety secondary Secretary side standard station steam street supply taken temperature terminal tion transformers transmission trouble tubes turbine United utilized various voltage volts water power York