Convention, Volume 5;Volume 39;Volume 62 |
Dari dalam buku
Hasil 1-3 dari 61
Halaman 169
To one side of the dam a spillway ( 400 ft long ) has been cut through a cliff of solid granite . On the opposite side of the dam a concrete log chute has been built to permit the passage of logs from the reservoirs to the river below .
To one side of the dam a spillway ( 400 ft long ) has been cut through a cliff of solid granite . On the opposite side of the dam a concrete log chute has been built to permit the passage of logs from the reservoirs to the river below .
Halaman 399
The ventilated air box at the side does not eliminate entirely the side wall clinker but makes it easily removable . The steam jets eliminate side wall clinkers . The form of jet which we use consists of a very small pipe along the side ...
The ventilated air box at the side does not eliminate entirely the side wall clinker but makes it easily removable . The steam jets eliminate side wall clinkers . The form of jet which we use consists of a very small pipe along the side ...
Halaman 654
It was my privilege in coming to the convention to ride in the cab of the electric locomotive from Deer Lodge , on the west side of the Rocky Mountains , to Three Forks , on the east side , and my observations on that trip may be of ...
It was my privilege in coming to the convention to ride in the cab of the electric locomotive from Deer Lodge , on the west side of the Rocky Mountains , to Three Forks , on the east side , and my observations on that trip may be of ...
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Isi
TWO VOLTMETER METHOD FOR TESTING POTENTIAL TRANS | 16 |
TWO WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
RECENT DEVELOPMENTS | 36 |
19 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention accidents amount apparatus arresters Association belt bill boiler Bureau cable capacity carried cause cent central circuit City coal Committee companies complete connected considerable considered construction cost desirable determined discussion distribution effect efficiency electric Employees energy engine equipment Falls finger give given glove hand important inches increase indicate installed insulation interest joint lamps lead less light load manufacturers material matter means measured meetings meter method necessary obtained operation Organization phase placed plants poles possible practice present pressure production protection railroad ratio reason recommendations River rules safety secondary Secretary side standard station steam street supply taken temperature terminal tion transformers transmission trouble tubes turbine United utilized various voltage volts water power York