Convention, Volume 5;Volume 39;Volume 62 |
Dari dalam buku
Hasil 1-3 dari 42
Halaman 77
As a matter of fact , I believe the terminal boards were removed from transformers of 10 - kw candlepower and larger without taking them from the poles . The results of this investigation indicated a considerable improvement in the ...
As a matter of fact , I believe the terminal boards were removed from transformers of 10 - kw candlepower and larger without taking them from the poles . The results of this investigation indicated a considerable improvement in the ...
Halaman 79
The results of the latter investigation , i . e . , placing arresters on transformer poles , while indicating a ... on the same pole with the transformer , we next moved all lightning arresters from line poles to transformer poles .
The results of the latter investigation , i . e . , placing arresters on transformer poles , while indicating a ... on the same pole with the transformer , we next moved all lightning arresters from line poles to transformer poles .
Halaman 176
It was decided to use extra heavy selected wooden poles , 55 ft long , with a top diameter not less than 9 in . and a proportionately large butt . These poles were reinforced throughout their entire length with two 6 - in . , 8 - lb ...
It was decided to use extra heavy selected wooden poles , 55 ft long , with a top diameter not less than 9 in . and a proportionately large butt . These poles were reinforced throughout their entire length with two 6 - in . , 8 - lb ...
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Isi
TWO VOLTMETER METHOD FOR TESTING POTENTIAL TRANS | 16 |
TWO WATTHOUR METER METHOD OF TESTING INSTRUMENT | 26 |
RECENT DEVELOPMENTS | 36 |
19 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
Accident Prevention accidents amount apparatus arresters Association belt bill boiler Bureau cable capacity carried cause cent central circuit City coal Committee companies complete connected considerable considered construction cost desirable determined discussion distribution effect efficiency electric Employees energy engine equipment Falls finger give given glove hand important inches increase indicate installed insulation interest joint lamps lead less light load manufacturers material matter means measured meetings meter method necessary obtained operation Organization phase placed plants poles possible practice present pressure production protection railroad ratio reason recommendations River rules safety secondary Secretary side standard station steam street supply taken temperature terminal tion transformers transmission trouble tubes turbine United utilized various voltage volts water power York