Final Survey Study for Great Lakes and St. Lawrence Seaway Navigation Season Extension: Appendix D. Economic benefits and costs. Appendix E. GLU.S. Army Engineer District, Detroit, Corps of Engineers, 1979 |
Istilah dan frasa umum
Amortization Annual Operation areas BASELINE STUDY Cape Vincent cargo Clair River coal Detroit River dredged EIS PREP PHASE environmental studies environmental study costs evaluated Extended Season Program extended winter navigation fish and wildlife forecast grain habitat ice booms Ice Control Structures ice cover Icebreaker Mooring Icebreaking impacts Interest & Amortization inventory Investment Annual Interest iron Lake Erie Lake Huron Lake Michigan Lake Ontario Lake St Lake Superior Lawrence River Lawrence Seaway located lock capacity Maintenance Total Annual Marys River modes MONITORING EVAL movements NAVIGATION SEASON EXTENSION Neebish Neebish Island Normal Season Operation & Maintenance percent PHASE II GOM proposed COE developments Proposed Plan railroads result revenue routes Saved from Stockpile ships short tons Soo Locks specific Stockpiling Savings Table Total Annual Cost Total Investment Annual traffic update and monitoring Vessel Speed Control Welland Canal Winter Rate Savings X X X X X X