Dari dalam buku
Hasil 1-3 dari 83
Halaman 976
“ After the first unit has been in operation a given period of time , the steam supplied to this turbine is automatically shut off and the steam is admitted to the turbine which drives the second unit . This unit is operated in a ...
“ After the first unit has been in operation a given period of time , the steam supplied to this turbine is automatically shut off and the steam is admitted to the turbine which drives the second unit . This unit is operated in a ...
Halaman 993
The Benjamin Engineering Company “ The Hess - Benjamin System of Combustion Control has been developed not with the idea that combustion or the operation of boilers could be carried on entirely automatically , but rather with the idea ...
The Benjamin Engineering Company “ The Hess - Benjamin System of Combustion Control has been developed not with the idea that combustion or the operation of boilers could be carried on entirely automatically , but rather with the idea ...
Halaman 1047
The following statement by Payne Dean , Limited , indicates some of the difficulties encountered in electric operation and control of valves : “ As regards electrical operation of high temperature steel valves , I have had a number of ...
The following statement by Payne Dean , Limited , indicates some of the difficulties encountered in electric operation and control of valves : “ As regards electrical operation of high temperature steel valves , I have had a number of ...
Apa yang dikatakan orang - Tulis resensi
Kami tak menemukan resensi di tempat biasanya.
Isi
25 P M | 649 |
Report of Inductive Interference Committee A E Silver Chairman | 856 |
30 P M | 879 |
6 bagian lainnya tidak diperlihatkan
Edisi yang lain - Lihat semua
Istilah dan frasa umum
amount arms arrangement average boiler burners capacity carried cause cent circuit close coal Committee Company conductor connection considerable construction cost covering desired draft economizer effect efficiency Electric Engineering equipment experience feed feet fire fuel furnace give given ground wires heat higher hour important inch increased indicate installed insulators interest iron less Light lignite limit load loss lower manufacturers material means mechanical method necessary obtained operation pins pipe plant poles possible practice present pressure problem production pulverized pump reduced removed shown shows specifications standard station steam steel stoker superheat supply surface TABLE tank temperature tion treated treatment trouble tubes turbine units usually valve voltage wood