Proceedings of the ... Annual Convention of the American Railway Engineering Association, Volume 16

Sampul Depan
Committee on Publications of the Association, 1915
List of members in v. 1-10.
 

Isi


Edisi yang lain - Lihat semua

Istilah dan frasa umum

Bagian yang populer

Halaman 95 - If at any time there shall be evidence of any lien or claim for which, if established, the Owner of the said premises might become liable, and which is chargeable to the Contractor, the Owner shall have the right to retain out of any payment then due or thereafter to become due an amount sufficient to completely indemnify him against such lien or claim.
Halaman 100 - This agreement shall inure to the benefit of and be binding upon the legal representatives and successors of the parties respectively.
Halaman 1147 - THE PRESIDENT: We will now take up the report of the Committee on Meters, Mr.
Halaman 908 - ... either red or black, and is so fixed by growth or position that it will retain its place in the piece.
Halaman 944 - ... long or a carriage bolt not less than 4 ii. x3-8 in. except that when the arms are so spaced that the braces cannot be attached to the poles in this manner, they shall be fastened vertically to the arms at points situated two-thirds of the distance from the center of the pole to the end of the arm, and in addition a pair of braces shall be attached in the usual manner to the bottom arm and the pole.
Halaman 406 - All tests and inspection shall be made at the place of manufacture prior to shipment, and shall be so conducted as not to interfere unnecessarily with the operation of the works.
Halaman 98 - Company does not give notice in writing to the Contractor to resume work at a date within of the date fixed in the written notice to suspend, then the Contractor may abandon that portion of the work so suspended and he will be entitled to the estimates and payments for work done, on such portion so abandoned, as provided in Section 38 of this contract Expediting Work, Correcting Imperfections.
Halaman 28 - Hadley is a member of the American Railway Engineering Association and the American Society of Civil Engineers.
Halaman 173 - ... such viaduct and its approaches. The proceedings for such purpose shall be the same as provided herein for the purpose of determining damages to property owners by reason of the...
Halaman 97 - If the Contractor shall be delayed in the performance of the work from any cause for which the Company is responsible, he shall, upon written application to the Chief Engineer at the time of such delay, be granted such extension of time as the Chief Engineer shall deem equitable and just. Suspension of Work. 32. The Company may at any time stop the work, or any part thereof, by giving ten (10) days' notice to the Contractor in writing.

Informasi bibliografi