Cost of material and labor for the completion of one set field officers' quarters, siz captains',

and six double sets lieutenants' quarters. 2,100 feet lumber for weather-boarding, at $19 per M

$399 00 6 kegs nails, cut 8d., at $1.75 per keg

28 50 6 kegs pails, cut 10d., at $4.75 per keg

28 50 40 bushels lime, at $1 per bushel...

40 00 1,050 pounds whiting, at 1) cents per pound

15 75 3,000 pounds white lead, at $8.37 per 100 pounds

251 10 104 gallons linseed oil, at 75 cents per gallon

78 00 10 gallons Japan dryer, at 60 cents per gallon

6 00 180 pairs window shutters, 14 by 36, 4 lights, at $2.75 per pair.

495 00 198 pairs window shutters, 10 by 12, 6 lights, at $1.75 per pair

346 50 378 sets fastenings for same, at 20 cents per set.

75 60 278 pounds chrome green, for shutters, at 12 cents

33 36 278 gallons linseed oil, at 75 cents per gallon ..

208 50 396 boxes roofing tin, at $8.75 per box

3, 465 00 792 pounds solder, at 25 cents per pound.

198 00 Cost of material.

5, 668 81 2 painters, at $80 per month each, 1 month

160 00 1 plasterer, at $30 per month, 1 month..

80 00 4 carpenters, at $80 per month, 1 month..

3:20 00 5 tinners, at $80 per month, for 3 months..

1, 120 00

Total cost.

7,348 81

Cost of constructing one porch to one set of infantry barracks. 5,5:34 feet lumber, at $19 per M

60 pounds nails, cut 4d., at $4.75 per keg. 50 pounds nails, cut 10d., at $4.75 per keg. 40 pounds nails, cut 20d., at $3.75 per keg.. 100 pounds white lead, at $8.37 per 100 pounds. 12 gallons linseed oil, at 75 cents per gallon....

$105 14

2 85 2 37 1 50 8 37 9 00

Cost of material..... 2 carpenters, at $80 each, for 20 days...

129 23 106 66

235 89

943 56

Total cost of 1 porch.
Cost of 4 porcbes...

Cost of constructing one porch to one set of cavalry barracks. 7,050 feet of lumber, at $19 per M..

60 pounds nails, cut 4d., at $4.75 per keg. 100 pounds nails, cut 10d., at $4.75 per keg

35 pounds nails, cut 20d., at 3.75 per keg. 150 pounds white lead, at $8.37 per 100 pounds 15 gallons linseed oil, at 75 cents per gallon.

$133 95

2 85 4 75 1 31 12 55 11 25

166 66 117 32

283 98

851 94

Cost of material..
2 carpenters, at $80 per month each, for 22 days

Total cost of 1 porch .......
Cost of 3 porches.....

Cost of constructing porch to headquarters building. 6, 125 feet lumber, at $19 per M.

50 pounds nails, cut 20d., at $3.75 per keg.
60 pounds pails, cut 10d., at $4.75 per keg.
50 pounds nails, cut 4d., at $4 per keg
20 pounds nails, cut 10d., casing, at $4.75 per keg
100 pounds white lead, at $8.37 per 100 pounds..
12 gallons linseed oil, at 75 cents per gallon...

Cost of material...
1 carpenter, at $80 per month, for 25 days.

Total cost of porch.

$116 30

1 87 2 85 2 00

95 8 37 9 00

141 34 66 66

208 00

Cost of material, 8c., required for the completion of three sets cavalry and four sets infantry

barracks, three storehouses, and one headquarters building. 83,000 feet lumber for weather-boarding, at $19 per M.

$1,577 00 124 kegs nails, cut 8d., at $4.75 per keg.

59 37 124 kegs nails, cut 10d., at $4.75 per keg.

59 37 2,000 kegs mineral paint, at 3 cents per pound.

60 00 320 gallons linseed oil, at 75 cents per gallon..

240 00 300 pounds white lead, at $8.37 per 100 pounds.

25 11 50 pounds Prussian blue, at 45 cents per pound.

22 50 1,700 bushels lime, at $1 per bushel....

1,700 00 Cost of material......

3,743 35 4 Plasterers, at $80 per month each, for 1 month..

320 00 4 carpenters, at $80 per month each, for 1 month..

640 00

Total cost....

4,703 35

Cost of constructing one carpenters' and paint shop. 18,297 feet lumber, at $19 per M..

40 window-sashes, 10 by 12, 6 lights, at $1 per pair.
4 panel doors, i by by 1$, at $1.45 each..
4 door locks and knobs, at $1 each....
4 pair butts, 334 by 31, at 20 cents per pair.
4 pair strap hinges, dr, at 30 cents per pair..
1 gross screws, cut 13", No. 9..
1 keg nails, cut 200..
1 keg nails, cnt 10d.
1 keg nails, cut 8d..
2 kegs nails, cut 4d., at $1 per keg
7 bushels lime, at $1 per bushel
500 bricks, at 2 cents each...

Cost of material...
3 carpenters, at $80 per inonth each, for 27 days....
1 mason, at $80 per month, for 3 days...

$359 04 20 00 5 80 4 00

80 1 20

24 3 75 4 75 4 75 8 00 7 00 10 00

429 33 216 00

8 00

Total cost..

653 33

Cost of constructing one blacksmith shop. 10,783 feet lumber, at $19 per M

10 window-sashes, 10 by 12, 6 lights, at $1 each.
150 pounds nails, cut 4d., at $4 per keg :-
50 pounds nails, cut 20d., at $3.75 per keg.
150 pounds nails, cut 10d., at $4.75 per keg.
50 pounds nails, cut 8d., at $4.75 per keg.
240 pounds bar iron for binges, at $4 per cwt.

48 carriage-bolts, 1 by 5, at $2.56 per cwt.
7,000 bricks for forges and foundations, at 2 cents each.
21 bushels lime, at $1 per bushel.

Cost of material... 2 carpenters, at $80 per month each, for 27 days. 1 mason, at $0 per month, for 1 month...

$204 88

5 00 6 00 1 87 7 12 2 37 9 60

1 23 140 00 21 00

399 07 144 00 80 00

Total cost..

623 07

Cost of constructing one wheelwright shop. 6,884 feet lumber, at $19 per M 12 window-sashes, 10 by 12, 6 lights, at $1 per pair. 2 pair s'rap hinges, at 30 cents per pair.. 1 keg nails, cut 10d 50 pounds nails, cut 20d., at $3.75 per keg 50 pounds nails, cnt 8d., at $4.75 per keg. 40 pounds nails, cut 4d., at $4 per keg. 7 bushels lime, at $1 per bushel.... 500 bricks for chimney, at 2 cents each.

$130 80 6 00

60 4 75 1 87 2 37 1 60 7 00 10 00

Cost of material.

164 99

1 carpenter, at $0 per month, for 26 days 1 mason, at $80 per month, for 3 days

$69 33

8 00

Total cost...

242 32

Cost of constructing one saddler and tin shop.
9,500 feet lumber, at $19 per M
1,000 bricks for chimney, at 2 cents each..

10 bushels lime, at $1 per bushel
16 window sashes, 10 by 10, 6 lights, at $1 per pair
3 panel doors f by f by 1$, at $1.45 each..
3 pair butts, 34 by 31, at 20 cents each ...
1 gross screws, cut 13", No. 9, at 25 cents per gross.

1 keg nails, cut 10d
50 pounds nails, cut 8d., at $4.75 per keg
50 pounds nails, cut 20d., at $3.75 per keg
50 pounds nails, cut 4d., at $4 per keg..

$180 50

20 00 10 00 8 00 4 35 60

8 4 75 2 38 1 88 2 00

Cost of material... 2 carpenters, at $80 per month each, for 20 days

234 54 106 66

341 20

Cost of constructing one caralry stable. 68,700 feet lumber, at $19 per M

10 kegs nails, cnt 4d., at $4 per keg
4 kegs pails, cut 8d., at $4.75 per keg.
15 kegs pails, cut 20d., at $3.75 per keg.
12 kegs nails, cut 10d., at $4.75 per key.
6 window-sashes, 10 by 12, 6 lights, at $1 per pair
4 panel doors, , by by 1$, at $1.45 each
4 pair butts, 34 by 31, at 20 cents per pair
1 gross screws. cnt 11, No. 9..
200 ponnds tire iron for door hinges, at $4 per 100 pounds
80 carriage-bolts, at $2.50 per hundred ..
10 hooks and staples, at 10 cents each...

Cost of material....
9 carpenters for 1 month, at $80 per month each

$1,305 30

40 00 19 00 56 25 57 00 3 00 5 80

50

25 8 00 2 00 1 00

1, 498 40

720 00

Total cost.....

2, 218 40

Cost of constructing quartermaster's corral. 80,913 feet lumber, at $19 per M .....

23 pair strap hinges, 8 inches, at :30 cents per pair
4 gross screws, cut 1 inch, No. 9, at 19 cents per gross
15 kegs nails, cnt 20d., at $3.75 per keg.
12 kegs nails, cut 10d., at $4.75 per keg
G kegs nails, cnt 4d., at $4 per keg
3 panel doors, ģ by $ by 1$, at $1.45 each
3 door locks and knobs, at $1 each
3 pairs butts, 3} by 31, at 20 cents per pair.
6 window-sashes, 10 by 12, 6 lights, at $1 per pair.
23 basps and staples, at 15 cents each

$1,537 35

6 90

76 56 25 57 00 24 00 4 35 3 00

60 3 00 3 45

Cost of material.. 10 carpenters for 1 month, at $80 per month each

1, 696 66

800 00

Total cost..

2, 496 66

Cost of constructing one brick grain-house. 250,000 bricks, at 2 cents each..

900 bushels lime, at $1 per bushel 26,740 feet of lumber, at $19 per M..

21 kegs nails, cut 4d., at $4 per keg:
2 kegs nails, cut 10d., at $4.75 per keg.

$5,000 00

900 00 508 36 10 00 9 50

[blocks in formation]

49,572 feet of lumber, at $19 per M.

40 window-sashes, 6 lights, 10 by 10, at $1 per pair.
10 panel doors, if by g by 19, at $1.45 each...
10 door locks and knobs, at $1 each.
10 pair butts, 31 by 31, at 20 cents per pair..
2 gross screws, cut 1 inch, No. 8, at 19 cents per gross
48 wardrobe-hooks, at $2 per gross.
3 kegs nails, cut 200., at $3.75 per keg.
4 kegs nails, cut 8d., at $4.75 per keg.
6 kegs nails, cut 10d., at $4.75 per keg.
3 kegs nails, cut 4d., at $4 per keg.
2 kegs nails, cut 8d, finish, at $4.25 per keg.

1 keg pails, cut 3d., at $5.45 per keg,
3,000 bricks for chimneys, at 2 cents each..
200 busbels lime, at $1 per bushel..
28 bushels plastering hair, at 19 cents per bushel

2 barrels plaster of Paris, at $2 per barrel 400 pounds white lead, at $8.37 per cwt. 30 gallons linseed oil, at 75 cents per gallon....

$941 57

20 00 14 50 10 00 2 00

38

66 11 25 19 00 28 50 12 00 8 50 5 45 60 00 200 00

5 32 4 00 33 48 22 50

Cost of material.. 4 carpenters, at $80 per month each, for 1 month. 1 plasterer, at $80 per month, for 1 month..

1, 399 41 320 00 80 00

Total cost.

1,799 41

Cost of constructing one set of ordnance sergeants' quarters. 9,122 feet lumber, at $19 per M.

12 window-sashes, 6 lights, 10 by 12, at $1 per pair
4 panel doors, f by by 1$, at $1.45 each..
4 pair butts, 31 by 31, at 20 cents per pair.

gross screws, cut 1 inch, No. 8, at 20 cents per gross.
50 pounds nails, cut 20d., at $3.75 per keg.
1 keg pails, cut 8d...
1 keg nails, cut 10d.
50 pounds nails, cut 4d., at $4 per keg.
50 pounds nails, cut 8d., finish, at $4.75 per keg
40 pounds nails, cut 3d., at $5.45 per keg
1,000 bricks for chimneys, 'at 2 cents each..

4 door locks and knobs, at $1 each...
1 barrel plaster of Paris, at $2 per barrel.
47 bushels lime, at $1 per bushel
10 bushels plastering hair, at 19 cents per bushel.
50 ponnds white lead, at $8.37 per 100 pounds
6 gallons linseed oil, at 75 cents per gallo

Cost of material...
? carpenters, at $80 per month each, for 20 days..
1 plasterer, at $80 per month, for 20 days...

$173 31

6 00 5 80

80

05 1 88 4 75 4 75 2 00 2 13 2 18 20 00 4 00 2 00 47 00 1 90 4 19 4 50

287 24 106 66 5 33

Total cost..

447 23

Cost of machinery, fc., required at Fort McKinney, Wyoming Territory. 1 sawmill, No. 4, Griffith & Wedge, Janesville, Ohio, manufacturers... $700 00 gummer.

20 00 H. Ex. 160 -2

1 planer and matcher, 8 by 20, assorted belting. 1 sticker with full set of knives.. 1 shingle machine, complete... 54 feet belting leather, double, 6 inches, at $1 per foot.. 24 feet belting rubber, 4 ply, 8 inches, at 60 cents per foot. 24 feet belting rubber, 4 ply, 3 inches, at 29 cents per foot. 80 feet belting rubber, 4 ply, 6 inches, at 38 cents per foot. 36 feet belting rubber, 4 ply, 12 inches, at $1 per foot 1 oil-cup for steam chest, large size.. 1 smoke-stack, 12 inches diameter, 30 feet long. 1 saw arbor, 14 inches by 20.... 1 shaft, 18 feet long, with 2 pulleys.. 1 shaft, 3 feet long, with 2 pulleys.. 1 tightning-pulley, 14 inches diameter, 8-inch face.. 1 tightning-pulley, 14 inches diameter, 12-inch face.. 1 shaft, 8 feet long, vertical and 2 pulleys . 1 shaft, 60 feet long, 8 boxes and collars, and 5 pulleys.

Total cost....

Cost of material required to supply post with water. 1, 342 feet 31-inch iron pipe, at 65 cents per foot 4,000 feet 31-inch iron pipe, at 55 cents per foot.. 1, 200 feet 21-inch iron pipe, at 40 cents per foot

15 hydrants, at $45 each'..
15 T's, 3-inch, at $1 each.
3 T's, 31-inch, at $1.50 each.
1 cross, 3-inch, at $2 each..
6 ells 3-inch, at 80 cents each
15 flanges, 24-inch, at $1.25
20 nipples, 2-inch, at 30 cents.
1 water-tank, 14 by 16..

Total cost.

RECAPITULATION. 2 sets captains' quarters 2 sheds to captains' quarters. 3 porches to captains' quarters... 2 double sets of lieutenants' quarters 5 porches to lieutenants' quarters 2 sheds to lieutenants' quarters 1 porch to tield officers' quarters

Fence around officers' quarters. Completing officers' quarters. porches to infantry barracks porches to cavalry barracks.. porch to headquarters building Completing men's barracks

carpenter and paint shop 1 blacksmith shop.. 1 wheelwright shop 1 saddler and tin shop. 1 cavalry stable .. 1 quartermaster corral. 1 brick grain-house.. 1 chapel and school-house.. 1 set ordnance sergeants' quarters. 1 Machinery, &c

Water-works

4 3 1

Total..